1.2. ATC Positions and Hierarchy
On VATSIM, controllers have the option to assume specific positions that mirror real-world procedures. These positions include:
- Delivery (DEL)
- Ground (GND)
- Tower (TWR)
- Approach (APP)
- Control (CTR)
As per the VATSIM Global Controller Adminstration Policy, ATC shall provide a "top-down" service and whenever traffic load permits cover for any missing control positions beneath them; this applies to all control positions from CTR down.